Installation information for ER-UP/ G housing

(also Requirements in line with approval and approval)

ER-UP/G are equipped with a plastic housing without fire protection equipment. The ER-UP/G housing may be installed in the following installation positions:

Suitable mounting material is to be provided by the customer.

The plastic shutter should be prepared according to these instructions so that it closes fully sealed in the installation position.

The housing must be inserted without any distortion. Failure to do so will mean that the fan insert cannot engage correctly in the housing and the degree of protection stated on the rating plate is no longer ensured.

Break open the housing segment [S] below to use the ER-ZR second room connection set or the ER-AS extraction socket.

A toilet seat air extraction unit is connected to the housing using the ER-AS extraction socket (DN 75/80).

The toilet seat air extraction unit must not be connected to the second room connection socket or the Centro exhaust air element.

Use ER-MO expanded rubber for acoustic insulation of thin ceilings capable of resonance (System and accessory components).